BLEMAB Project muon detectors installed at No.2 Blast Furnace at Arcelor Mittal Bremen
Two muon detectors have been installed at blast furnace No.2 of the Arcelor Mittal steelworks in Bremen to perform the world's first ever simultaneous stereoscopic muography!

The second muon detectors during transport to the measuring point.

One of the two muon detectors ready to start measurements.